Summer Road Closures Scheduled

In order to replace culvert pipes on Donald Rd and Antioch Rd, the Clermont County Engineer’s Office has notified Tate Township of these closings with detours.  Signs will be placed to notify residents and give detours.

Donald Rd will be closed to through traffic on Monday 7/17- Thursday 7/20 from 7AM to 5PM between addresses 2118 & 2150 Donald Rd.  Two culverts will be replaced.  The detour will be 8.19 miles.

Antioch Rd will be closed to through traffic on Wednesday 7/19 – Monday 7/24 from 7AM to 5PM with the work starting between addresses 1842 & 1859 Antioch Rd.  Two culverts will be replaced.  The detour will be 4.37 miles.

%d bloggers like this: